About
Alpha Ridge Landfill opened in May 1980. Muncipal Solid Waste (trash) buried in a landfill generates landfill gas as it decomposes. In 1999, the County voluntarily installed a landfill gas collection and flare system to protect the environment, prevent odors, prevent migration of landfill gas and protect the geomembrane cap over the closed landfill cell. While the operation of the existing landfill gas flare meets the objectives, the County had been searching for alternate uses of its landfill gas.
Additional Information
Background
After a competitive bid process, the County hired Pepco Energy Services to design and build a landfill gas to energy system. Similar to the existing landfill gas flare, the landfill gas to energy system will protect the environment by controlling methane (a greenhouse gas). In addition, it will offset the use of non-renewable energy resources. The electricity generated will be used to power the landfill gas to energy system itself, the existing landfill gas collection and flare system, and a new vehicle charging station. The balance of electricity generated will be sold on the PJM regional transmission grid to offset some of the landfill operational costs.
At a public hearing in October 2011 for the air permit to construct, attendees asked many questions about the generator system. Because of the format of the meeting, neither the County nor Maryland Department of Environment were prepared to answer the detailed nature of the questions. The following link provides a document that answers many of the raised questions.
Scheduled and Completed Efforts
Information current as of 4-7-2020
Every 8,760 operating hours or three years, whichever comes first - The engine emissions will be retested for combustion parameters based on the permit requirements.
Spring 2014
- Report of the emission testing of the engine completed and available.
- Fourth, Updated Safety Evaluation: Emissions from the Gas-Flare and Engine at the Alpha Ridge Landfill, April 23, 2014.
December 2013
An independent contractor conducted an emission test of the engine for Polychlorinated Dibenzo-P-Dioxins and Polychlorinated Dibenzo-Furans - Also known as “Dioxins”, and Volatile Organic Compounds (VOCs).
July 2013
- Report of the emission testing of the engine completed and available.
- Third, Updated Safety Evaluation: Emissions from the Gas-Flare and Engine at the Alpha Ridge Landfill, July 26, 2013.
May 2013
An independent contractor conducted an emission test of the engine for dioxins and VOCs.
December 2012
- Report of the emission testing of the engine completed and available.
- Second, Updated Safety Evaluation: Emissions from the Gas-Flare and Engine at the Alpha Ridge Landfill, December 31, 2012.
November 2012
- An independent contractor conducted an emission test of the engine for dioxins and VOCs.
September 21, 2012
- Landfill gas to energy went online for electricity production.
May 2012
- Start up and commissioning activities began and continued through July including air permit required emission testing.
March 2012
- Construction began and continued through mid May. (see pictures).
- Report of the emission and influent tests of the existing flare completed and available.
- Updated Safety Evaluation March 29, 2012: Alpha Ridge Landfill Emissions From The Flare and Proposed Engine
- Appendix to Updated Safety Evaluation
January 2012
- An independent contractor conducted an emission test of the current landfill gas flare for dioxins and VOCs. (see pictures).
- An independent contractor conducted an influent test (landfill gas going to flare) for VOCs and mercury.
- The Bureau of Environmental Services provided recommendations responding to the concerns of the residents on the project and generator operations.
- ARL Gas to Energy Project Update January 25, 2012